North Jeff Davis Avenue Extension
Long Beach, Mississippi

Overstreet and Associates provided comprehensive design services for the North Jeff Davis Avenue extension project. The scope of services included:

  • Traffic Study Reports: Conducted detailed traffic studies to assess the impact and requirements for the new road extension.
  • Bid Process Coordination: Worked closely with the Owner throughout the bid process to ensure smooth communication and decision-making.
  • Permit Acquisition: Secured all necessary permits for the construction activities.
  • Topographical Survey: Performed a thorough topographical survey to inform the design and construction processes.
  • Construction Administration: Managed the construction administration to ensure the project adhered to design specifications and standards.
  • Inspection Services: Provided continuous inspection services to monitor construction quality and progress.

Project Details: The project involved the extension and construction of North Jeff Davis Avenue. Key components of the project include:

  • Road Construction: Extension of the existing road with new asphalt paving.
  • Curb & Gutter: Installation of curbs and gutters for improved water runoff management.
  • Watermain Installation: Extension of the watermain to support the new road infrastructure.
  • Stormwater Drainage: Implementation of a stormwater drainage system to manage runoff and prevent flooding.
  • Connectivity: Connecting West Railroad Street to East Old Pass Road, enhancing local traffic flow and accessibility.

This project demonstrates Overstreet and Associates’ commitment to delivering high-quality design and construction services, ensuring seamless project execution from planning through to construction.