Drainage improvements along East Woolmarket Road in Biloxi
Our team undertook a comprehensive scope of work encompassing various drainage infrastructure enhancements. The project involved the cleaning and widening of approximately 3,000 linear feet of drainage channels, along with the improvement of 5,000 linear feet of roadside ditches and 640 linear feet of designated drainage ditches within easements. A significant aspect of the initiative was the installation of a poured in-place double cell 10’x6’ reinforced concrete box culvert adjacent to an existing 106×6’ reinforced concrete box culvert, in addition to laying 2,750 linear feet of 58” x 36” reinforced concrete arch pipe. The undertaking also encompassed upgrading and/or replacing existing drainage culverts and structures, stabilizing ditch banks, implementing stormwater management solutions, and restoring disturbed areas.